1. Registration trouble? Please use the "Contact Us" link at the bottom right corner of the page and your issue will be resolved.
    Dismiss Notice

Please Help!!! Engine installation hardware

Discussion in 'Intermediate CJ-5/6/7/8' started by shibby12435, Jan 25, 2011.

  1. Jan 25, 2011
    shibby12435

    shibby12435 Member

    Columbus, MS
    Joined:
    Apr 16, 2009
    Messages:
    74
    I am finally ready to install my freshly rebuilt 258 into my 75 CJ5. I took this motor out over a year ago with the intentions of rebuilding it in a month. Ended up doing the T-14 and Dana 20 while i had them out. Now that I am ready to put it back in i am kicking myself for not doing a better job of recording where bolts went. I also need to buy a lot of new hardware since the dufus PO stripped everything he could. Here is the list so far of info I need to get her back together: I would greatly appreciate any help you can provide.

    1. The bolts that hold the mount bracket to the block, do they have a lock-nut, washer, or is it one of the bolts with the washer built in?

    2. Same as above for the bolts holding the transmission to the bell housing + length.

    3. My mounts go in opposite of the what the Chilton manual says, on mine the single hole goes down on both and into a slot on the driver side mount( I think)? Is this correct?

    4. If anyone has a 75 or like model with a 258 could you please take some pics of your engine bay from all angles and post them?
     
New Posts